Get Involved

Project Updates

Updates are currently available for the following Forest Preserve District of DuPage County projects:

Ongoing Projects

  • Spring Brook Meander Project
    The Forest Preserve District of DuPage County has targeted Spring Brook, a tributary
    of the DuPage River, at Springbrook Prairie Forest Preserve in Naperville...
  • West Branch Riverway Trail (483 KB PDF)
    The West Branch Riverway Trail will run west along the West Branch...
  • West Branch Regional Trail (1.86 MB PDF)
    The project will provide an additional 1.7 miles of trail to the preserve's existing trail...
  • McDowell Grove Trail South (5.80 MB PDF)
    Establishing a network of trails and greenways has long been a goal...

Completed Projects

  • East Branch Off-Leash Dog Area Improvements
    The off-leash dog area will remain at its present location and existing amenities
    will be upgraded...
  • Lemont Road Trailhead and Parking Lot
    This proposed entrance drive and parking area will serve as a point of access
    into the western part of Waterfall Glen...
  • Blackwell Off-Leash Dog Area Perimeter Fencing (414 KB PDF)
    Construction plans for the Blackwell off-leash dog area are complete, and a fencing
    contract is to be executed in February or March.
  • Mayslake Sanitary Sewer Repairs (233 KB PDF)
    The District will install a single sanitary sewer to service both the Peabody Hall and
    Retreat Wing buildings at Mayslake Peabody Estate, reducing the overall length of
    sewer pipe to be maintained.
  • Oldfield Oaks (396 KB PDF)
    At the forest preserve, a small two-mile walking trail will wind through oak woodlands
    and prairie.
  • Greene Valley Off-leash Dog Area (1.65 MB PDF)
    Construction on the Greene Valley Off-leash Dog Area began...
  • Danada House Addition (184 KB PDF)
    Construction on the Danda House has begun...
  • Herrick Lake Dredging (313 KB PDF)
    Removal of accumulated sediment from Herrick Lake to provide several
    water-quality benefits...
  • Herrick Lake Trail Connection (545 KB PDF)
    A 0.6-mile-long multipurpose trail that will connect Herrick Lake preserve to the
    Illinois Prairie Path...
  • Mayslake Peabody Estate (409 KB PDF)
    Improvements inlcude a relocated front entrance, additional parking...
  • Meacham Grove Bridge (216 KB PDF)
    A multipurpose trail bridge that will be a key component of the
    North Central DuPage Regional Trail...
  • Lyman Woods Visitor Center (206 KB PDF)
    A 2,800 square-foot visitor center, 124-car parking lot with lighting...
  • McDowell Grove Trail North (204 KB PDF)
    McDowell Grove trail will link the regional trail along the West Branch of the
    DuPage River...
  • Waterfall Glen (5.49 MB PDF)
    Habitat improvement project...
  • Districtwide Structures (271 KB PDF)
    Construction is currently underway at Hidden Lake, Herrick Lake, Spring Creek
    Reservoir and Springbrook Prairie...
  • Springbrook Prairie (234 KB PDF)
    The culmination of many years of planning consist of 8.5-mile perimeter loop trail
    system, three bridges, three...
  • Spring Creek Reservoir (233 KB PDF)
    A new parking lot and trail...
  • West Branch Regional Trail (211 KB PDF)
    Establishing a network of trails and greenways has been the goal...
Street Address: 3 S 580 Naperville Road, Wheaton, IL 60187-8761
Mailing Address: P.O. Box 5000, Wheaton, IL 60189-5000
email: forest@dupageforest.com (630) 933-7200 Fax: (630) 933-7204 TTY: (800) 526-0857